Case Study: BlazeMaster® Fire Protection Systems Makes Florida High-Rise Retrofit Trouble-Free

Learn how to complete retrofits quickly with minimal disruptions
The retrofit was mandated by state law, and the facility manager was concerned about the potential for complaints about noise, dirt, blocked hallways and other disruptions. The contractor, Sprinklermatic of South Florida, used BlazeMaster® CPVC to make the job faster and less disruptive while reducing costs compared to steel pipe.
The facility manager reported that rather than complaints the project drew positive comments from residents. The project was completed more quickly than expected and Sprinklermatic completed a trouble-free installation