Case Study: BlazeMaster® CPVC Streamlines Commercial Retrofit

Learn how easy installation can reduce labor by up to 35%
Alwest Fire Protection used steel pipe for the first of a three-building office retrofit in Sacramento but found that installation was slow and challenging. By switching to BlazeMaster® CPVC for the other two buildings, Alwest reduced labor costs to save $21,000.
Using BlazeMaster CPVC helped Alwest complete the work overnight and leave the offices clean for workers the next morning. The owner offers six tips to help make your next retrofit a success.